KAAKarman Archery
Architecture

Karman Archery Architecture / Part II — The tool

Part II · The tool · Chapter 3

Safety and checks

3.1Passive Safety Engineering and Face Protection

The Infinity Bow™ includes an advanced passive safety solution derived from the study of elastic dynamics under tension:

  • Controlled Weak Point / Planned Wear: The two junction knots that attach the cord (2 mm paracord serving simulator) to the two ends of the tubular elastic are the main points of wear and stress. The design concentrates the load here so that any failure can only occur on controlled, easily inspected components.
  • Forward Release Vector (Face Protection): In the unlikely event that one of the knots breaks or gives way under tension, the circular shape of the frame and the dynamics of the cords guide the latex elastic to continue its travel forward towards the frame, away from the archer’s face and eyes. This design choice does not replace the checks to be carried out before every session (section 3.2).

3.2Checks Before Every Session

Before every session the archer — or the Instructor, for younger learners — carries out five checks. They take less than 10 seconds and are part of the preparation ritual.

  • Junctions between elastic and cord. They are the most stressed point: they must show no wear, frayed threads, separation or signs of abnormal tension.
  • Elastic. No cuts, no cracks, no obvious loss of elasticity.
  • Frame screws. The six M4×12 screws must be tight and the 2 ABS body units of the Infinity Bow™ must be properly joined.
  • Accessories. Every fitted accessory must be fully secured: the FormLine™ screw, the red pin of the G.A.S.™ and of the Clicker Simulator™, the Bow-Clip of the AeroAxis™.
  • Work area. Nobody in front of the archer or within reach of the elastics; the tool is never pointed at one’s own face or anyone else’s.

If any check fails, the tool is not used until the problem is solved.

3.3Inspection, Maintenance and Replacement of the Dynamic String

The latex Elastic String must be replaced when it shows wear, loss of elasticity or damage to the junctions between elastic and cord. Replacement takes four steps:

  1. Unscrew the 6 M4×12 hex-head screws around the perimeter of the Infinity Bow™.
  2. Gently separate the 2 symmetrical units of the 3D polymer frame.
  3. Remove the worn string from its internal channel.
  4. Seat the new spare string (from the Experience Kit), making sure the Serving Simulator is centred, rejoin the half-shells and screw the screws back in. Take care when tightening: screw each screw only until it seats, with the washer in contact, without forcing. Over-tightening can damage the frame of the Infinity Bow™.

After replacement, repeat the checks in section 3.2 and make a few test draws at reduced load.